Home › History

1963 to 2026

Carlton Centre History

For 46 years Carlton Centre was the tallest building in Africa. This is how it was planned and built, what happened to the Carlton Hotel, and how the building reached its 2020s story of empty office floors, a busy mall and a new sale.

Carlton Centre timeline

How Carlton Centre was built

The land was assembled by South African Breweries and Anglo American Properties, and Anglo American drove the development. Construction began in 1967. The plan combined a 50-storey office tower, a hotel, an underground shopping arcade of about 160 shops and a parkade for roughly 2,000 cars, making it one of the most ambitious mixed-use projects of its time in South Africa.

Architecture and design

The American firm Skidmore, Owings & Merrill designed the complex, with Gordon Bunshaft associated with the project, working with the local practice Rhodes-Harrison Hoffe & Partners. The tower rises 223 metres over 50 storeys. It was the tallest building in Africa from 1973 to 2019 and briefly the tallest in the Southern Hemisphere. More detail is on Carlton Centre architecture.

Carlton Hotel history

The Carlton Hotel opened on 1 October 1972 as one of Johannesburg’s grand hotels. Sources differ on its size, reporting 600 to 670 rooms over 30 or 31 floors. As business moved to the northern suburbs, the main hotel closed in December 1997 and the Carlton Court annex followed in 1998. The building has stood empty since. Read more on Carlton Centre hotel history.

Historic attractions and facilities

Two features made Carlton Centre a destination as well as an office block. Top of Africa, the viewing level on the 50th floor, drew tourists for decades. The Sky Rink ice rink on top of the parkade was later redeveloped into Sky Rink Studios, a television production facility of about 2,400 m². These are historical facilities: Top of Africa’s current access is unconfirmed, and the ice rink no longer operates as a rink.

Carlton Centre today

In 2025 the Financial Mail described a brightly lit, busy shopping mall below a largely empty tower with a skeleton Transnet crew. The mall still trades with anchor tenant Shoprite and national brands, and in August 2026 Transnet put the centre up for sale again. For a practical visit, head to Carlton Centre shops, Carlton Centre restaurants or directions to Carlton Centre.

FAQs

When was Carlton Centre built?

Construction began in 1967, the centre officially opened on 1 September 1973, and the complex was completed in 1974.

Who designed Carlton Centre?

Skidmore, Owings & Merrill designed it, with the local firm Rhodes-Harrison Hoffe & Partners.

What happened to the Carlton Hotel?

It opened in 1972 and closed in 1997–1998 as business moved out of the CBD. The hotel building has been empty since.

Why is Carlton Centre historically significant?

It was Africa’s tallest building for 46 years, one of Johannesburg’s first large mixed-use complexes, and a symbol of the CBD’s rise, decline and renewal.

Visiting the Carlton Centre today?

The mall is still trading. Plan your trip with the shops directory and directions.

Last checked: 13 September 2026. CarltonCentre.co.za is an independent visitor guide. It is not operated by, or affiliated with, Transnet, Transnet Property, Carlton Centre management or the brands listed. Details were checked against the sources named on each page on 13 September 2026; confirm time-sensitive details with the store or organisation before you travel.